HIVE 40HC module at dusk, units visible behind the glazed service aisle

HIVE control software · Simulation briefing

The HIVE
follows the load.
Unit by unit.

How the HIVE controller stages 7 kW Enerbine generators and a battery buffer to track a demanding 24-hour load profile — shown in the HIVE simulator, in island mode.

HIVE · Control and Simulation · November 2026The Universal Power Source

The Enerbine film

Power generation, rebuilt as a repeatable unit.

The 7 kW Enerbine is the cell. The HIVE is the organism: units come on line one by one, are swapped without tools and run on any gas.

HIVE · Control and Simulation 2026The Universal Power Source
Enerbine 7 kW unit, perspective view

The building block

A 7 kW generator with one moving part, built to be multiplied.

The Enerbine is a microturbine generator designed as a unit of a larger plant: compressor, turbine and generator on a single shaft, a 3D-printed recuperator, and its own power electronics in one slide-in cartridge.

1

Moving part

One rotating assembly on air bearings. No gearbox, no lubricating oil.

7 kW

Per unit

One unit is a fraction of a percent of a HIVE module.

Years

Maintenance-free

Designed to operate for years without maintenance.

NG · RNG · H₂

Fuel flexibility

Lean-burn combustion for low CO and NOx.

HIVE · Control and Simulation 2026enerbine

Architecture

The same 7 kW unit, repeated at every scale.

MATRIX 3×8 168 kW, MATRIX 6×7 294 kW, MATRIX 2×5 70 kW and the 7 kW core unit, next to a human figure for scale
7 kWUnit · one Enerbine
168 kWCore · 3 columns × 8 units, one Ethernet bridge
294 kWMATRIX 6×7 · the hive simulated in this briefing
2,184 kWHIVE 40HC · 13 cores, 312 units in a 40 ft enclosure
HIVE · Control and Simulation 2026enerbine

Control architecture

Distributed control with no single point of failure.

HIVE · Control and Simulation 2026The Universal Power Source

The application

24 hours of HIVE operation in 60 seconds.

The HIVE tab of the Enerbine Thermodynamic Cycle Calculator, running at 1,440× real time. Select a moment to jump to it.

Simulated clock00:00

    Configuration

    A 294 kW hive with a battery buffer, islanded from the grid.

    ParameterSetting in this run
    Layout8 rows × 6 columns42 generating units and 6 battery modules on the same DC bus
    Unit rating7 kW per unit294 kW installed generation
    Demand profileHigh peaks, aggressiveFast load steps between roughly 35 kW and full capacity
    Grid connectionOff — island modeEvery kilowatt is generated or stored on site
    Dispatch strategyEfficiency ↔ Life sliderTrades per-unit loading against run hours and starts
    Hot reserve8%Spinning headroom held above demand
    Battery6 modules · 19.9 kWh50 kW nominal and 75 kW peak (10 s) per module, 98% DC/DC
    Simulation speed1,440× real timeOne simulated day per real minute
    MATRIX 6×7 enclosure with 42 Enerbine units

    MATRIX 6×7 · 294 kW. The 42 generating positions of the simulated hive, with the battery modules on the shared DC bus.

    HIVE · Control and Simulation 2026enerbine

    Dispatch logic

    Every unit has a state. The controller moves units between them.

    Stage, then shareUnits come on line as demand rises and drop to standby as it falls. Running units share the load equally.
    Bridge with storageWhile new units start, the battery covers the gap on the DC bus, so a load step never reaches the customer as a sag.
    Rotate the fleetStarts and run hours are spread across the hive, guided by the Efficiency ↔ Life setting.
    HIVE · Control and Simulation 2026enerbine

    What the run shows

    Full load met in island mode, with no alarms and no grid support.

    294kW
    Peak demand met
    100% of installed generation, reached twice in the day with all 42 units on line.
    8 : 1
    Load range followed
    From 36.5 kW to 294 kW, with 10 to 42 units running.
    18kW
    Largest transient gap
    Covered entirely by the battery while three units started. Equal to 6% of installed capacity.
    ≈ 609V
    DC bus voltage
    Held flat through every load step of the day.
    3.6MWh
    Energy delivered
    Over the simulated 24 hours, with 1,010 kg of fuel.
    29–80%
    Battery state of charge
    The buffer is recharged between events and never depleted.
    0
    Grid import or export
    The hive and its battery carried the full profile alone.
    0
    Alarms
    Leadership heartbeat reported healthy for the whole run.

    Simulator results for the configuration shown, with the engine configuration loaded in the calculator. Preliminary engineering data, not a performance guarantee.

    HIVE · Control and Simulation 2026enerbine

    Resilience testing

    Failures are rehearsed in software before they happen in the field.

    The simulator includes a fault-injection panel. Each scenario can be triggered mid-run to verify that the hive re-elects leadership, re-dispatches load and recovers.

    Units

    Random 1–2 unit trip

    One or two generators drop out. The remaining units and the battery absorb their share.

    Leadership

    Queen failure

    The coordinating unit is lost. Vice 1 takes over and a new Vice is appointed.

    Communications

    CAN column loss

    A column bus segment goes silent. Its units are isolated without affecting the rest.

    Communications

    Ethernet bridge loss

    A core loses its link to the hive. The fault stays contained to 24 units.

    Communications

    Total comms failure

    All links drop at once. Units must fall back to a safe autonomous state.

    Recovery

    Recover comms

    Links return. The hive rebuilds its leadership chain and resumes normal dispatch.

    HIVE · Control and Simulation 2026The Universal Power Source

    Serviceability

    A faulted unit is swapped, not repaired.

    1. The unit flags itselfIts display turns red and reads FRU, field-replaceable unit. The controller has already shifted its load to the rest of the hive.
    2. It slides out of its bayNo tools inside the unit, no fluids to drain. A spare slides into the same position.
    3. The hive is back to full capacityThe new unit starts, synchronises with the DC bus and reports generating. Overhaul happens at the factory, not on site.
    HIVE · Control and Simulation 2026The Universal Power Source
    HIVE 40HC module with optional exchange robot

    From simulation to product

    The same controller runs a 294 kW hive or a 5 MW module.

    294 kW

    MATRIX 6×7 · simulated

    Generating units
    42
    Storage
    19.9 kWh
    Mode
    Island
    Purpose
    Control validation
    2.2 MW

    HIVE 40HC 2.2 MW

    Generating units
    312
    Cores
    13, single row
    Output
    480 V AC or 800 V DC
    Service
    Walk-in aisle, while running
    4.9 MW

    HIVE 40HC 5 MW

    Generating units
    702
    Cores
    26, double row
    Output
    480 V AC or 800 V DC
    Service
    Side doors, from outside
    Nominal values at unit rating, before site derating. Preliminary design data, subject to change.enerbine
    enerbine

    Unit by unit, on demand

    Plan your site with us.

    sales@enerbine.comwww.enerbine.comHQ and manufacturing · Del Valle, TexasR&D · Buenos Aires
    HIVE · Control and Simulation 2026The Universal Power Source